Our team provided full MEP engineering design services for the tenant improvement and building addition of a new indoor athletic facility in Lake Forest, CA.

Electrical Design included new incoming service from the utility transformer, a complete power distribution system, lighting and façade controls, interior office lighting, outlets, HVAC power distribution, and low-voltage rough-ins.

HVAC Design delivered a new system with load calculations, air balance, office air distribution, restroom exhaust fans, and a warehouse ventilation system.

Plumbing Design covered domestic water, sanitary and venting systems, mechanical condensate collection, water heating, and full plumbing layout, drawings, and schedules.

Energy Compliance documentation was prepared for plumbing, HVAC, and lighting systems in accordance with state-approved prescriptive methods.

This project strengthens the facility’s infrastructure while ensuring compliance, comfort, and efficiency for both athletic and office use.