Our team has been engaged to deliver comprehensive MEP engineering design services for the Avalon Civic Center Housing Project in Avalon, CA.
Phase 1 involves preparing the SD set and 50% DD set, including a building load study, water system materials, HVAC specifications, panel sizing, MEP routing, and Title 24 compliance narrative. Detailed designs cover HVAC load reports and layouts, electrical power distribution and low-voltage systems, and plumbing systems with both domestic water and saltwater sanitary provisions.
Phase 2 advances the design to the 50% DD set and CD set, expanding into fully detailed mechanical, electrical, and plumbing documentation, including coordination with the utility provider and complete construction-ready plans.
This multi-phase approach ensures that the project is delivered with efficiency, accuracy, and compliance, while meeting the unique demands of Avalon’s Civic Center Housing development.